How to Check a Contractor's ROC Licence Before They Touch Your Land
How to look up an Arizona contractor at the Registrar, what CR-2, CR-41 and CR-53 cover, what the bond and Recovery Fund are worth on bare land, and the contract rules.

Every post on this site that names a contractor ends the same way: ask for the ROC number and check it. This is the post that explains how, what you are looking at, and what the licence is actually worth if the job goes wrong. It is less than it sounds, and still worth the five minutes.
When a licence is required
Arizona requires a licence for contracting work unless an exemption applies. The one everyone has heard of is the handyman exemption, and it is narrower than its reputation.
Under A.R.S. § 32-1121(A)(14), work is exempt when it is "of a casual or minor nature" and the price, "including labor, materials and all other items", is less than $1,000. The same paragraph then takes most of that back:
- It does not apply if the work requires a local building permit.
- It does not apply where the work is part of a larger operation, or a job is split into contracts under $1,000 "for the purpose of evasion of this chapter or otherwise."
- It does not apply to anyone whose advertising fails to include the words "not a licensed contractor."
So a $3,000 lot clearing is not handyman work. It is over the threshold, it is not minor, and quoting it as three $900 days does not change that. The Registrar's consumer notice says the same: licensed if the total, labour and materials, exceeds $1,000 or the work needs a permit.
The other exemption that matters is § 32-1121(A)(5), the owner-builder: you may work on your own property without a licence if it is for your sole occupancy and not for sale or rent. That covers you clearing your own lot. It does not cover a neighbour with a skid steer doing it for cash.
How to run the search
The licence database is at azroc.my.site.com, reached from roc.az.gov, searchable by licence number or business name. Confirm three things:
- Status. The Registrar's advice is to make sure the licence "is current on the day you sign the contract." Not last year.
- Name. The entity on the licence should be the entity on your contract and on the cheque.
- Classification. A licence is for a scope of work, not for everything. This is the one people skip.
The Registrar also takes calls on 1-877-692-9762.
What the classifications mean
Arizona issues commercial (A- and C-), residential (R-) and dual (CR-) licences. The classifications a Cochise County landowner meets most often:
| Classification | What the Registrar says it covers | Typical job |
|---|---|---|
| CR-2 / A-5 / R-2 Excavating, Grading and Oil Surfacing | Moving, altering or repairing earthen materials by digging, trenching, grading, horizontal boring, compacting and filling; oil surfacing; shoring, geotextiles and liners. The commercial A-5 adds incidental blasting. Expressly does not allow excavating for water, gas or oil wells. | Lot clearing with a machine, pads, driveways, drainage grading, trenching |
| CR-41 Septic Tanks and Systems | Excavating, installing and repairing pipe, backfilling and compacting soil to install and repair septic tanks, aerobic digesters and leaching fields. | Septic installation |
| CR-21 Hardscaping and Irrigation Systems | Uncovered patios, walkways and driveways of brick, stone, pavers or gravel; garden walls to 6 ft; retaining walls to 3 ft; irrigation and water features with the excavating and grading those need. Not concrete driveways, perimeter fencing, blasting, or gas and plumbing lines. | Landscape work around a finished house |
| CR-53 Water Well Drilling | Drilling new wells or deepening existing ones, casing, gravel packing, well repair and pump installation. | Your well |
| B General Residential | Construct and repair all or any part of a residential structure or appurtenance. | The general building the house, who may subcontract the above |
Note that "clearing" and "grubbing" do not appear in the CR-2 scope; it is written in terms of moving earth. In practice machine clearing is done under CR-2 or a general licence; if a contractor says otherwise, ask the Registrar.
What the bond is, and is not
Every licensee posts a surety bond under A.R.S. § 32-1152. For a specialty residential contractor it is between $1,000 and $7,500; for a general residential contractor, $5,000 to $15,000. Commercial amounts scale with volume. A dual CR- licensee posts one bond with separate residential and commercial portions, so the residential portion behind your job is in that $1,000 to $7,500 range.
The residential bond covers the Registrar, people who furnished labour or materials, and owners described in the Recovery Fund statute. Notice the size: a $7,500 bond behind a $20,000 pad-and-driveway job is a floor shared with every other claimant that year, not insurance.
The Residential Contractors' Recovery Fund
Under § 32-1152(C), a residential or dual licensee must either post an additional $200,000 bond or pay into the Recovery Fund; the Registrar says most choose the fund. Under § 32-1132, the fund compensates people damaged by a licensed residential contractor's violation of the licensing law, provided the contractor was licensed when the contract was signed, when the first payment was made, or when work began. Payment is capped under § 32-1133(E) at $30,000, after anything recovered elsewhere, including the bond, is subtracted.
Section 32-1132(B) limits the fund to people who own the damaged residential real property and "occupy, or intend to occupy" it as their primary residence, with parallel rules for LLCs, trusts and lessees. If the parcel is bare land you bought to hold or sell, you are probably not a claimant, and the bond is what stands behind the job. If you are clearing the lot you intend to build your home on, you have an argument. We cannot tell you how the Registrar reads "intend to occupy" for a vacant parcel; ask before you assume.
Getting to the fund is a process. The Registrar's Recovery Fund page says a claim may be filed only after discipline is obtained through a complaint and the bond claim has been fully processed, and within two years after all proceedings and appeals on the Registrar's order end. The civil route in § 32-1133 has its own two-year clock.
What the contract must say
A.R.S. § 32-1158(A) applies to any contract over $1,000 between a contractor and a property owner and requires it to be in writing with:
- The contractor's name, business address and licence number.
- Your name and mailing address, and the jobsite address or legal description.
- The date of the contract.
- The estimated completion date.
- A description of the work.
- The total price, including taxes.
- Any advance deposit.
- Any progress payments and the stage at which each is due.
- A notice, in at least ten-point bold type, that you have the right to file a written complaint with the Registrar within the time allowed, with the Registrar's phone number and website.
Both parties sign, and you get a legible copy and a written receipt for any cash. For a lot clearing, item 5 is the one that matters: acres, what stays, where the material goes, haul-off included or not. "Clear lot" describes nothing. A contract missing these things is still a contract, § 32-1158(C) says so, but a contractor who leaves out their licence number has told you something.
If the job goes wrong
The licence buys you access to the Registrar's complaint process, which is free. For remodels and repairs, where site work falls, a complaint "must be filed within two years from the date work was last performed." You file through the online portal and an investigator contacts you. The Compliance Department also investigates unlicensed contracting, so a complaint against someone who should have had a licence is still worth filing, though there is no bond or fund behind them. If you are chasing money the order is complaint, discipline, bond claim, then Recovery Fund. Keep the contract, the scale tickets, the photographs and every text message.
The short version
Over $1,000 or needs a permit means licensed, and a $3,000 clearing is both. Search the name at azroc.my.site.com on the day you sign; check status, name and classification: CR-2 or a general licence for dirt work, CR-41 for septic, CR-53 for the well. Expect a $1,000 to $7,500 bond and a $30,000 Recovery Fund cap that may not reach bare land. Get the nine contract items in writing. You have two years from the last day of work to complain.
When a contractor calls you through this site, they have been asked for their ROC number and told you will check it. Do. Tell us the parcel and the job and a licensed local contractor will call you to quote it. Our owner-builder post covers what you may do yourself.
Sources
Every number in this article traces to one of these. Rules and fees change — if you are reading this a year from now, check the source before you rely on the figure.
- Arizona ROC — contractor licence search
- Arizona ROC — "Don't Get Tricked, Check the License" (the $1,000 rule, phone number)
- Arizona ROC — licence classifications
- A.R.S. § 32-1121 — exemptions, including the handyman and owner-builder exemptions
- A.R.S. § 32-1152 — licence bond amounts
- A.R.S. § 32-1132 — Residential Contractors' Recovery Fund, who may recover
- A.R.S. § 32-1133 — Recovery Fund, $30,000 limit
- A.R.S. § 32-1158 — required contents of a residential contract
- Arizona ROC — filing a complaint (time limits); Recovery Fund page at roc.az.gov/recovery-fund
Working on a parcel in Cochise County?
Tell us the parcel and the job — clearing, pads, driveways, trenching, tanks, solar — and an independent, ROC-licensed Cochise County contractor will call you to quote it. Usually within one business day.
Keep reading
Owner-Builder, Part Two: The Inspections You Still Get, and What Happens at Sale
The Cochise County owner-builder opt-out does not mean nobody visits. Which inspections survive under each option, the 36-month clock, the 2026 code change, and resale.
Permits & CountySeptic in Cochise County: The Soil Evaluation, the 100-Foot Rule and Caliche
Cochise County wants a soil and site evaluation before you can even apply for a septic permit — three test pits, twelve feet deep or to an impervious layer. Here is what that means, the setbacks that constrain your whole site plan, and why a composting toilet does not get you out of it.
Permits & CountyThe Owner-Builder Opt-Out: What It Lets You Skip, and What It Does Not
Cochise County lets an owner build their own home on rural land with limited inspections, or none at all. It is genuinely unusual. It also has a four-acre floor, a five-year limit, a recorded notice on your title, and a long list of things it does not waive.
Permits & CountyGetting an Address for Vacant Land in Cochise County
Most vacant parcels here have no address, and addresses are normally assigned through the building permit — which is a problem when you need one to get a utility account or a delivery first. Here is the route around it, and why the road name step catches people out.